this post was submitted on 19 Oct 2024
113 points (90.6% liked)

Green Energy

2172 readers
143 users here now

everything about energy production

founded 2 years ago
MODERATORS
 

I'm all for putting solar panels all over the place, but won't these get dusty and oily and need loads of cleaning after trains pass over?

Also, costing €623,000 over three years sounds rather expensive for just 100m (although that roughly equates to 11KW).

you are viewing a single comment's thread
view the rest of the comments
[–] humanspiral@lemmy.ca 1 points 11 hours ago (1 children)

about 42 panels per hour. If that includes wiring somehow, that is faster than other solar. Maybe their daily productivity estimate includes scooting out of the way of other trains and less than 24 hours operation.

[–] Valmond@lemmy.world 1 points 10 hours ago

I didn't knew the problem with ordinary solar was the installation time \s

How on earth do you "scoot out of the way" of other trains when you yourself is a train?

I feel you all are just shitting me lol 😂