this post was submitted on 06 Dec 2023
70 points (100.0% liked)

Right To Repair

403 readers
1 users here now

Throwing a wrench into the gears of planned obsolescence.

founded 1 year ago
MODERATORS
 

cross-posted from: https://lemmy.world/post/9227800

Polish train manufacturer that lost servicing tender programmed train controller to brick itself after train stays for some time in 6 ISP facilities or in 1 their faculity(for testing?) until undocumented button combination is pressed. Some controller versions brick itself after train is idle for 10 days. After news about this became public, manufacturer removed ability to unlock train by button combination.

Also manufacturer is able to remotely brick train over internet(connected via GSM) at any time.

Mod wanted ONLY article, so enjoy reading in polish.

top 1 comments
sorted by: hot top controversial new old
[–] JohnDClay@sh.itjust.works 9 points 11 months ago

Here's the summary from the author in English. https://social.hackerspace.pl/@q3k/111528162462505087