this post was submitted on 24 Jun 2024
437 points (98.0% liked)
Asklemmy
43739 readers
1220 users here now
A loosely moderated place to ask open-ended questions
If your post meets the following criteria, it's welcome here!
- Open-ended question
- Not offensive: at this point, we do not have the bandwidth to moderate overtly political discussions. Assume best intent and be excellent to each other.
- Not regarding using or support for Lemmy: context, see the list of support communities and tools for finding communities below
- Not ad nauseam inducing: please make sure it is a question that would be new to most members
- An actual topic of discussion
Looking for support?
Looking for a community?
- Lemmyverse: community search
- sub.rehab: maps old subreddits to fediverse options, marks official as such
- !lemmy411@lemmy.ca: a community for finding communities
~Icon~ ~by~ ~@Double_A@discuss.tchncs.de~
founded 5 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
Building HVAC engineering (equipment sizing, ducting design, etc.) has been largely handwavy bullshit for a very long time and only recently has moved towards any sort of precision. Not uncommon to find boiler plants that are 3-4 times the maximum heating load in the winter, or fans running at 100% 24/7 when code only requires half of that.
Costs just get passed on to tenants so there was never much motivation to do better, the only reason building owners are moving now is because of government regulation and incentive programs.
I used to work in HVAC. I remember we had a small cold room that was struggling to maintain temperature, as in, design was supposed to be 0°F but it couldn't get below 36°F. There was a large hole in the box that was undoubtedly the cause of the problem, so I asked the installer how they accounted for that. "Oh, I doubled the infiltration value." When I tried calculating the actual losses it was way, way higher than the infiltration value. Like, the room needed someting like 3-4 times its total refrigeration capacity to reach target with a giant fucking hole in the box.
No idea who thought putting a giant hole in the box was a good idea.
"Sealed" is also a vague suggestion with HVAC. Every ducting join, every piece of equipment, all of it leaks. I shudder to think how much heating/cooling is wasted that way.