this post was submitted on 10 Jan 2024
180 points (95.5% liked)

Linux

48311 readers
709 users here now

From Wikipedia, the free encyclopedia

Linux is a family of open source Unix-like operating systems based on the Linux kernel, an operating system kernel first released on September 17, 1991 by Linus Torvalds. Linux is typically packaged in a Linux distribution (or distro for short).

Distributions include the Linux kernel and supporting system software and libraries, many of which are provided by the GNU Project. Many Linux distributions use the word "Linux" in their name, but the Free Software Foundation uses the name GNU/Linux to emphasize the importance of GNU software, causing some controversy.

Rules

Related Communities

Community icon by Alpár-Etele Méder, licensed under CC BY 3.0

founded 5 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] hersh 8 points 10 months ago

This is correct, albeit not universal.

KDE has a predefined schedule for "release candidates", which includes RC2 later this month. So "RC1" is clearly not going to be the final version. See: https://community.kde.org/Schedules/February_2024_MegaRelease

This is at least somewhat common. In fact, it's the same way the Linux kernel development cycle works. They have 7 release candidates, released on a weekly basis between the beta period and final release. See: https://www.kernel.org/category/releases.html

In the world of proprietary corporate software, I more often see release candidates presented as potentially final; i.e. literal candidates for release. The idea of scheduling multiple RCs in advance doesn't make sense in that context, since each one is intended to be the last (with fingers crossed).

It's kind of splitting hairs, honestly, and I suspect this distinction has more to do with the transparency of open-source projects than anything else. Apple, for example, may indeed have a schedule for multiple macOS RCs right from the start and simply choose not to share that information. They present every "release candidate" as being potentially the final version (and indeed, the final version will be the same build as the final RC), but in practice there's always more than one. Also, Apple is hardly an ideal example to follow, since they've apparently never even heard of semantic version numbering. Major compatibility-breaking changes are often introduced in minor point releases. It's infuriating. But I digress.