this post was submitted on 09 Nov 2023
2 points (100.0% liked)

That Workshop

1 readers
1 users here now

Big ideas. Small places. https://thatworkshop.com

founded 1 year ago
MODERATORS
 

Current Construction Projects:

  1. Finish Drywall/sand/paint and install trim to office Door
  2. Kids tree-house base/floor
  3. Main bedroom bath exhaust fan install
  4. Kitchen Range exhaust fan/vent install
  5. Build out fire walls for server room
  6. Finish Fiber pull to server rack and Terminate *new since now I remember I still need to do this too

Current hardware projects:

  1. Kids custom 3d printed TLK keyboards
  2. Micro cluster rack mount design
  3. Micro cluster storage solution
  4. De-com old server, ship to Xydros
  5. Move racks to server room
  6. Rebuild rack layout
  7. Add UPS to wireless/nvr/camera equipment

Software Projects:

  1. OPNsense/PFsense update
  2. Pihole for DNS
  3. Degoogle storage
  4. Degoogle photos
  5. Degoogle calendar
  6. 3-2-1 bakup solution
you are viewing a single comment's thread
view the rest of the comments
[–] infinitevalence@discuss.online 2 points 1 year ago (1 children)

Steel studs, 2 layers of drywall, rockwoll insulation, emergency power cut switch, and all electrical in steel conduit.

[–] jgrim@discuss.online 1 points 1 year ago (1 children)

It is, but it costs less than replacing a house :P And it is not that much more than traditional wood stud framing.