this post was submitted on 13 Oct 2023
35 points (97.3% liked)

Trains

841 readers
1 users here now

Everything about trains and railroads

founded 2 years ago
MODERATORS
 

Battery trains will begin operating each hour between Liverpool Central and Headbolt Lane.

The battery technology removes the need for a live third rail, which could enable the Merseyrail network to run in places previously inaccessible, including as far as Manchester, Wrexham, Warrington, Preston and Runcorn.

Exciting development!

you are viewing a single comment's thread
view the rest of the comments

This is inaccurate for the UK. A lot of the lines have tunnels (e.g. along to Holyhead) or have geography (e.g. CVL) or planning issues that makes electrification of the whole line much more expensive. By contrast, if you have bi or trimodal trains you can electrify the easy parts while avoiding the high cost parts, which means you can roll out the electrification of the easy bits so much quicker.