Additionally diurnal storage is required for nuclear to meet a variable load anyway (as an 8hr battery is $2.5/W vs $20/W for additional reactor capacity). So the comparison then becomes building the nuclear reactor to run at <25% load factor vs. filling the rest of the load with any other method.
It arrived over the last 5 years.
Additionally diurnal storage is required for nuclear to meet a variable load anyway (as an 8hr battery is $2.5/W vs $20/W for additional reactor capacity). So the comparison then becomes building the nuclear reactor to run at <25% load factor vs. filling the rest of the load with any other method.